Gujarat Power System - Real-time Data (excluding DD and DNH wef 1/4/2009) 

07:04:04 14-01-10                                                                49.95Hz

Station Name Installed Capacity Generation Name Allocation Schedule Drawal

UI

Dhuvaran 220 61 Gujarat (C/S) 2794 314 137 -178
Dhuvaran (Gas) 219 185 GUVNL   314 359 44
Ukai 850 677

DGVCL

1779.58 1338 1445 109
Wanakbori 1470 1435 MGVCL 1502.42 816 886 70
Gandhinagar 870 544 UGVCL 2235 1447 1833 385
Sikka 240 169 PGVCL 2955 2145 2205 60
Kutch (Lignite) 215 113 TPAECo   51 74 23
Utran (Gas) (I+II) 135+375 211 TPSECo   261    257 -3
Ukai  (Hydro) 305 0     Schedule Injection

UI

Kadana (Hydro) 242 0 SUGEN   723    965 -242
GIPCL-1 145 (52) 162  
GIPCL-2 165 0 UI Rate ( Rs. / Unit ) 2.16
Surat Lignite 250 255  
Akrimota 250 80 GSECL Total Generation 3397
GSEG 156 122 Private Total Generation 3346
GPEC 655 640 Gujarat Total Generation 6744
Essar 515 (300) 180 Central Sector Drawal 137
Essar+Bhandar(Injection) 116  
WindFarm(GuvnlPurchase)

1622 (818)

545  
TPAeco 500 394    
Sugen 1147 965    
Adani Power 330

309

   
ssp(RBPH) 1200 1    
ssp(CHPH) 250

60

Gujarat Catered MW 6861

Note: Allocation of CPP and Central Sector is revised as per revised allocation received on 25th April 2008 and allocation of State generating station considered as received on 17th May 2007. Allocation of Sipat and Kahalgaon considered as per capacity synchronized.

Real time data shown on this website are indicative only out of commercial ambit.