Gujarat Power System - Real-time Data (excluding DD and DNH wef 1/4/2009) 

 23:44:11 04-02-12                 49.85 Hz                                 UI Rate(Rs./Unit): 2.79

Station Name Installed Capacity Generation Name Allocation Schedule Drawal

UI

Dhuvaran (Gas) 219 86 Gujarat (C/S) 2754.88 1366 926 -426
Ukai 850 830 Guvnl   1366 730 -635
Wanakbori 1470 1492

Dgvcl(w)

3373 1413 1541 128
Gandhinagar 870 649 Mgvcl(w) 1780 1071 1015 -49
Sikka 240 0 Ugvcl(w) 3361 2061 2048 -17
Kutch (Lignite) 290 232 Pgvcl(w) 4162 2836 2540 -295
Utran(Gas)(I+II) 135+375 41+185 Tpae(w)   224 227 3
Ukai  (Hydro) 305 81 Tpse(w)   313    306 -7
Kadana (Hydro) 242 0     Schedule Injection

UI

GIPCL-1 145 (52) 127 SUGEN   408    611 203
GIPCL-2 165 0  
Slpp(I+II) 250+250 123+242    
Akrimota 250 21 GSECL Total Generation 3599
GSEG 156 93 State owned IPP's Generation 606
GPEC 655 176 Other IPP's Generation 1159
Essar 515 (300) 158 Torrent Power 1059
TPAeco 500 448 Gujarat Total Conventional Generation 8026
Essar+Bhandar(Injection) -103    
Sugen 1147 611 Wind Generation 272
Adani(I+II) 1320 (1000) +660 (500)

825 + 1329

   
ssp(RBPH) 1200 -2 Central Sector Drawal 926
ssp(CHPH) 250

30

   
      Gujarat Catered MW 8931

Note:
[1] Discom schedules are displayed with proportionate wind farm (W/F) generation allocations.
[2] Allocations of CPP, Central Sector and State Generating stations effective from 01-March-2011
[3] Real time data shown on this website are indicative only out of commercial ambit.